Project section | Status |
---|---|
Regional planning examination | |
Grid connection commitment | |
Species protection survey / environmental report | |
Building application procedure, urban land use planning procedure | |
Project takeover by investor/operator | MK energy 1 GmbH & Co KG |
Building permit | |
Expected commissioning | Q4/2025 |
Ground-mounted photovoltaic system
MK solutions & consulting is planning an open-space solar park with a nominal output of 19 MWp in the grassland. This project is also cross-community. The electricity generated will be supplied to a supra-regional transformer station and marketed via PPAs.
Power Purchase Agreement in short PPA, is a (often) long-term power supply contract between two parties, usually between a power producer and a power buyer (power consumer or power trader), or simply put, a power purchase agreement.
Project section | Status |
---|---|
Regional planning examination | |
Grid connection commitment | |
Species protection survey / environmental report | |
Building application procedure, urban land use planning procedure | |
Project takeover by investor/operator | Steel Group |
Building permit | |
Expected commissioning | Q4/2025 |
Ground-mounted photovoltaic system
MK solutions & consulting is planning an open-space solar park with a nominal output of 19 MWp in the grassland. This project is also cross-community. The electricity generated will be supplied to a supra-regional transformer station and marketed via PPAs.
Power Purchase Agreement in short PPA, is a (often) long-term power supply contract between two parties, usually between a power producer and a power buyer (power consumer or power trader), or simply put, a power purchase agreement.
Project section | Status |
---|---|
Regional planning examination | |
Grid connection commitment | |
Species protection survey / environmental report | |
Building application procedure, urban land use planning procedure | |
Project takeover by investor/operator | Kintlein & Ose |
Building permit | |
Expected commissioning | Q2/2025 |
Ground-mounted photovoltaic system
MK solutions & consulting is planning an open space solar park with a nominal output of 7 MWp in the verge area of the A60 motorway.
This project already has enormous momentum from local acceptance and is ideally suited for an innovation tender under § 39j of the Renewable Energy Sources Act.
Project section | Status |
---|---|
Regional planning examination | |
Grid connection commitment | |
Species protection survey / environmental report | |
Building application procedure, urban land use planning procedure | |
Project takeover by investor/operator | Momentum |
Building permit | |
Expected commissioning | Q4/2024 |
Wind power
South of the Belgian border and between the towns of Roth near Prüm and Ormont, there are currently 20 wind turbines generating electricity with a total capacity of 32.1 MW. They were built in the period between 2001 and 2013 and some of them have already been renewed. On behalf of momentum Gruppen, MK solutions & consulting is planning to expand the existing wind farm by two Enercon E138 EP3 wind turbines with a hub height of 130.03 m, a total height of 199.15 m and an output of 3.5 MW each under the name Windpark Roth.
Project section | Status |
---|---|
Regional planning examination | |
Grid connection commitment | |
Species protection survey / environmental report | |
Building application procedure, urban land use planning procedure | |
Project takeover by investor/operator | |
Building permit | |
Expected commissioning |
Ground-mounted photovoltaic system
MK solutions & consulting is planning an open space solar park with a nominal output of 15 MWp in the verge area of the A1 motorway.
The project area concerns two local municipalities and is particularly characterized by a challenging situation of the properties as well as the grid feed-in.
Project section | Status |
---|---|
Regional planning examination | |
Grid connection commitment | |
Species protection survey / environmental report | |
Building application procedure, urban land use planning procedure | |
Project takeover by investor/operator | |
Building permit | |
Expected commissioning |
Ground-mounted photovoltaic system
MK solutions & consulting is planning an open space solar park in the grassland with a nominal capacity of 13 – 20 MWp. The local community has been involved in this project from the very beginning; the grid feed-in is virtually “around the corner”. A balanced project for the PPA1 user or remuneration via the EEG2
1)Power Purchase Agreement in short PPA, is a (often) long-term power supply contract between two parties, usually between a power producer and a power buyer (power consumer or power trader), or simply put, a power purchase agreement.
2)Renewable Energy Sources Act (EEG). The amount of the respective remuneration depends, among other things, on the type and origin of the energy source as well as the design and output of the generation plant.
Project section | Status |
---|---|
Regional planning examination | |
Grid connection commitment | |
Species protection survey / environmental report | |
Building application procedure, urban land use planning procedure | |
Project takeover by investor/operator | triguard |
Building permit | |
Expected commissioning | Q1/2025 |
Ground-mounted photovoltaic system
MK solutions & consulting is planning an open-space solar park with a nominal output of 8 MWp in the grassland. The electrical energy generated is delivered to a regional transformer station. For the remuneration of the generated electrical energy, marketing via the EEG or as a PPA is an option. Ideally, a storage medium is also built, please contact us directly.
Project section | Status |
---|---|
Regional planning examination | |
Grid connection commitment | |
Species protection survey / environmental report | |
Building application procedure, urban land use planning procedure | |
Project takeover by investor/operator | Triguard |
Building permit | |
Expected commissioning |
Ground-mounted photovoltaic system
MK solutions & consulting is planning an open space solar park with a nominal capacity of 15 MWp in the grassland. This project is also cross-community. The electrical power generated will be delivered directly to a regional substation and will be marketed through PPAs.
Power Purchase Agreement in short PPA, is a (often) long-term power supply contract between two parties, usually between a power producer and a power buyer (power consumer or power trader), or simply put, a power purchase agreement.
Project history wind power & photovoltaics
With solar and wind energy, you are choosing a clean future and attractive energy yields. Let’s talk to each other. Send us your inquiry or contact us by phone at:
02251 – 77 64 457Mon. – Fr. 08:00 – 17:00
Wir prüfen kostenfrei und unverbindlich, ob sich Ihre Freifläche für den Betrieb eines modernen Solar- oder Windparks eignet und mit welchem Leistungsertrag / Pachteinnahmen Sie rechnen können.